Sheetrocking Completed


Sheetrock is up and taping/floating has been done. These pictures were taken about noon on Saturday (9/4) and Rick said that the guys were supposed to come and do the texturing some time that afternoon. First shot looks up toward the loft.



Second shot shows the kitchen area with the utility/pantry off to the right.



The third shot, taken from near the back door, shows the storage area under the stairs (there will be a door leading to this area). To the right is a doorway leading to the master bedroom. The guest bedroom is behind the wall to the left.



Finally, a picture that shows that fish are nearby. Sarah's friend, Alan, holds up the 2 strings of catfish that we caught in about 2 hours of fishing the canal right in front of our house.


previous next
thumbnails home

Last update: 9/4/2004