Sheetrocking Completed
Sheetrock is up and taping/floating has been done.
These pictures were taken about noon on Saturday (9/4) and Rick said that the guys were supposed to come and do the
texturing some time that afternoon. First shot looks up toward the loft.
Second shot shows the kitchen area with the utility/pantry off to the right.
The third shot, taken from near the back door, shows the storage area under the stairs (there will be a door
leading to this area). To the right
is a doorway leading to the master bedroom. The guest bedroom is behind the wall to the left.
Finally, a picture that shows that fish are nearby. Sarah's friend, Alan, holds up the 2 strings of catfish that
we caught in about 2 hours of fishing the canal right in front of our house.
Last update: 9/4/2004